The joy
of teaching fifth grade was being able to perfect a lesson by the end of the
day. I can recall working on a district mandated project with a group of fifth
graders one year. I planned out a great lesson on Egypt. As a team of four, we
identified objectives and goals, and created an outline with deadlines. We
gathered materials such as resource books, online websites, videos, and Ancient
Egyptian artifacts. We planned activities like designing a mummy, creating a
power-point with important information, creating diorama of a bird’s eye view
of Memphis, Egypt. Students also compared Memphis, Egypt to Memphis, TN. The
planning phase was smooth and thought provoking. Each teacher shared insight
and ideas about the process of the project and its outcome.

The following is a list provided by Michael Greer (2010):
The Nuts and Bolts: 10 Steps to Project Success
This part of the book will help you perform
these essential PM steps:
Step 1: Define the project concept, then get
support and approval.
Step 2: Get your team together and start the
project.
Step 3: Figure out exactly what the finished
work products will be.
Step 4: Figure out what you need to do to
complete the work products. (Identify
tasks and phases.)
Step 5: Estimate time, effort, and resources.
Step 6: Build a schedule.
Step 7: Estimate the costs.
Step 8: Keep the project moving.
Step 9: Handle scope changes.
Step 10: Close out phases, close out the
project.
If my team had more time with steps 5,
6, 9 then the success of this project would have been more effective and
efficient. The students did enough to pass but not enough to build in-depth knowledge.
Greer, M.
2010. The Project Management Minimalist:
Just Enough PM to Rock Your Projects! Laureate
Education, Ed. Retrieved from https://class.waldenu.edu/bbcswebdav/institution/USW1/201320_04/ MS_INDT/EDUC_6145/Week%202/Resources/Week%202%20Resour ces/embedded/pm-minimalist-ver-3-laureate.pdf
No comments:
Post a Comment